Developers Process

Capture.png

Goldenfields Water main design and construction specifications 

Goldenfields Water Main Design and Construction Guidelines are additional to the WSAA Water Supply Code of Australia and must be adhered to by Developers undertaking design and construction of water mains in Goldenfields Water’s service area.

Water main design and construction specification(PDF, 3MB)

Pipeline Design Example(PDF, 323KB)

Goldenfields Water main contractor list

The Developer can only engage a Contractor that is on Goldenfields Water’s water main contractor list to undertake construction of water infrastructure that will become the property of Goldenfields Water.

There are currently no Contractors that have signed up for GWCC’s Water main contractor list.

Contractors wishing to be on GWCC’s Water main contractor list are required to fill out and return the following application form.

Application for GWCC water main contractor list(PDF, 417KB)

Relevant Policies

The following policies are relevant to the developer process and should be reviewed in conjunction with the above information.

• PP007 Water Connection Policy

• PP008 Developer Charges Policy

• PP032 Easement and Acquisition Policy

A copy of the policies can be located within the publications section of the Goldenfields Water website.